Investigating the Factors Affecting the Design Change In Construction Industry In UAE

Authors

DOI:

https://doi.org/10.55938/ijgasr.v1i4.32

Keywords:

Design, Construction Industry in the UAE, Design Change

Abstract

The construction industry in Dubai is fundamental and influential to the economy of this emirate. In order to execute projects successfully, it is necessary to deploy and integrate a wide variety of resources, skills, and competencies. Because of this demand, the building industry in Dubai has developed into a prestigious but fragmented one. This is due to a large number of stakeholders in the construction industry in Dubai. This research is designed to investigate the factors that contribute to design change in the construction industry in Dubai, UAE.  A construction project is usually processed with a set of interrelated activities happening with the aim of ensuring the client’s requirements are met. These activities are usually classified in a set of stages and phases; one very critical and important phase is the design stage. The findings of the study will provide insight into the factors that cause delays in project completion in Dubai. Owner’s factors, mainly poor coordination among the involved parties appear to be the main factor from the ‘owners’ This finding will assist in identifying the areas, which may need more attention. Similarly, the findings will also help in gaining awareness of other important factors, which cause delays, thus helping decision-makers in effective planning and implementation.

Downloads

Download data is not yet available.

References

Abu El-Ella, N., Bessant, J., & Pinkwart, A. (2015). Management of Permanent Change. Wiesbaden: Springer Fachverlag Wiesbaden; pp. 105-120. DOI: https://doi.org/10.1007/978-3-658-05014-6_6

Albach, H., Meffert, H., Pinkwart, A., & Reichwald, R. (2015). Management of Permanent Change. Wiesbaden: Springer Fachmedien. DOI: https://doi.org/10.1007/978-3-658-05014-6

Albogamy, A., Scott, D., & Dawood, N. (2013). Dilemma of Saudi Arabian Construction Industry. KICEM Journal of Construction Engineering and Project Management, 3(4), 35-40. DOI: https://doi.org/10.6106/JCEPM.2013.3.4.035

Al-Nuaimi, A. S., Taha, R., & Mohsin, M. A. (2010). Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman. Research Gate. DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000154

Anderson Ackermann, L., & Anderson, D. (2010). The Change Leader's Roadmap: How to Navigate Your Organization's Transformation. Pfeiffer.

Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52(3), 387-406. DOI: https://doi.org/10.1016/j.aej.2013.03.002

Bammens, Y., Notelaers, G., & Van Gils, A. (2013). Employees as a source of innovation: The role of perceived organizational support in family firms. Annual meeting proceedings. Academy of Management. DOI: https://doi.org/10.5465/ambpp.2013.29

Benedict, A. (2008). Survey Report Change Management 2007. SHRM Research - Society of Human Resource Management.

Burati et al. (1992).Causes of Quality Deviations in Design and Construction. Journal of Construction Engineering and Management, 118(1) .34–49 DOI: https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(34)

Burnes, B. (2014). Managing Change (6 ed.). Harlow, United Kingdom: Pearson Education Limited.

Creasy, T. (2015). Definition of Change Management. Retrieved 03. 09, 2015, from http://www.change-management.com/tutorial-defining-change-management.htm

Desai, M., & Bhatt, R. (2013). Critical Causes of Delay in Residential Construction Projects: Case Study of Central Gujarat Region of India. International Journal of Engineering Trends and Technology, 2(2), 762-768.

Dievernich, F. E., Gong, J., & Tokarski, K. O. (2015). Change Management and the Human Factor. Switzerland: Springer International Publishing. DOI: https://doi.org/10.1007/978-3-319-07434-4

Dispan, J., & Schwarz-Kocher, M. (2014). Maschinen- und Anlagebau in Deutschland - Entwicklungstrends und Herausforderungen, eine Literaturstudie. IMU Institut Stuttgart.

Edmonds, J. (2011). "Managing successful change", Industrial and Commercial Training. Emerald Insight, Vol. 43, Iss. 6, pp. 349 - 353. DOI: https://doi.org/10.1108/00197851111160478

Felden, B., & Hack, A. (2014). Management von Familienunternehmen- Besonderheiten, Handlungsfelder, Instrumente. Wiesbaden: Springer Fachmedien Wiesbaden. DOI: https://doi.org/10.1007/978-3-8349-4159-6

Friedrich, A., & Behrend, B. (2007). Erfolgsfaktoren im Veränderungsprozess,. Hamburger Berater Contor.

Gardezi, S. S., Manarvi, I., & Gardezi, J. (2013). Time Extension Factors in the Construction Industry of Pakistan. : Fourth International Symposium on Infrastructure Engineering in Developing Countries, IEDC 2013, 7. Karachi.

Ghosh, B., Liang, T. W., Meng, T. T., & Chan, B. (2001). The key success factors, distinctive capabilities, and strategic thrusts of top SMEs in Singapore. Journal of Business Research. DOI: https://doi.org/10.1016/S0148-2963(99)00047-8

Hölzl, H. (2012, January 5). OnPulson Wissen für Unternehmer und Führungskräfte. Retrieved May 19, 2015, from http://www.onpulson.de/4560/die-unternehmens-und-fuehrungskultur-muss-sich-bei-mittelstaendischen-unternehmen-wandeln

Ibbs, W. (2012). Construction change : Likelihood, severity, and impact on productivity. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, (August), 67–73. DOI: https://doi.org/10.1061/(ASCE)LA.1943-4170.0000089

Lauer, T. (2014). Change Management- Grundlagen und Erfolgsfaktoren. Aschaffenburg: Springer Gabler. DOI: https://doi.org/10.1007/978-3-662-43737-7

Lauer, T. (2014a). Change Management-Grundlagen und Erfolgsfaktoren (2 ed.). Berlin,Heidelberg: Springer Verlag. DOI: https://doi.org/10.1007/978-3-662-43737-7

Lehner, S. (2015). Systemtheorie und Emotionsmanagement als Säulen der Führungsarbeit. Wiesbaden: Springer Fachmedien. DOI: https://doi.org/10.1007/978-3-658-07970-3_5

Love, P. E. D., & Li, H. (2000). Quantifying the causes and costs of rework in construction. Construction Management and Economics, 28, 479–490. DOI: https://doi.org/10.1080/01446190050024897

Love, P. E. D. (2002). Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), 18–29. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(18)

Noé, M. (2014). Change-Prozesse effizient durchführen. Wiesbaden: SpringerGabler. DOI: https://doi.org/10.1007/978-3-658-04990-4

Okada A. (2017). Owner-Requested Changes in the Design and Construction of Palaneeswaran, E. (2006).Reducing Rework to Enhance Project Performance Levels. Proceedings of the one-day seminar on Recent development in project Management in Hong Kong, 5.1 – 5.10

Park, M. (2003). Dynamic Change Management for Fast-tracking Construction Projects, NIST. DOI: https://doi.org/10.22260/ISARC2002/0013

Peus, C., Frey, D., Gerkhardt, M., & Traut-Mattausch, E. (2009). Leading and Managing Organizational Change Initiatives. Management Revue, Volume 20, Issue 2. DOI: https://doi.org/10.5771/0935-9915-2009-2-158

Poeschl, H. (2013). Strategische Unternehmensführung zwischen Shareholder-Value und Stakeholder-Value. Wiesbaden: Springer Gabler. DOI: https://doi.org/10.1007/978-3-8349-4093-3

PWC. (2014). Wachstum durch Wandel-Enkelgeneration Familienunternehmen neue impulse. Retrieved 04 02, 2015, from http://www.pwc.de/de/pressemitteilungen/2014/wachstum-durch-wandel_enkelgeneration-gibt-familienunternehmen-neue-impulse.jhtml

Rees, G., & French, R. (2013). Leading, Managing and Developing people. CIPD.

Rizvi, M. (2019). UAE's construction sector will thrive beyond 2020. Retrieved from Khaleej Times: https://www.khaleejtimes.com/business/real-estate/construction-sector-will-thrive-beyond-2020

Sha, M., Shahi, P., Pandit, R., & Pandey, A. (2017). Causes and Effects of Delays in Construction Projets. IOSR Journal of Mechanical and Civil Engineering, 14(2), 52-58. DOI: https://doi.org/10.9790/16841402065258

Published

2022-12-31

How to Cite

A. A. Tomh, M. (2022). Investigating the Factors Affecting the Design Change In Construction Industry In UAE. International Journal for Global Academic & Scientific Research, 1(4), 53–64. https://doi.org/10.55938/ijgasr.v1i4.32

Similar Articles

<< < 1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.